Now the external walls are complete, the sunspaces and porches can be added to the houses.
Sunspaces under construction
The sunspaces to the rear are one and a half storeys high, with flat roofs containing two Velux roof lights, one opening and one fixed. The sunspaces are thermally separated from the main house, i.e. there are external quality triple glazed windows and doors between the house (kitchen/diner) and the sunspace.
The sunspace will harvest passive solar energy, and when the sunspace is warmer than the house, and the tenant wants to heat the house up, the windows and doors can be opened to the house and this heat will then transfer in and get absorbed into the mass of the floor and walls; it will then get given up by the mass when the air temperature cools. We are also planning to have this harvesting automated by a modification to the mechanical ventilation and heat recovery unit, such that it will take its air supply from the sunspace instead of outside, when the sunspace is warmer than the house, and the air temperature inside the house is below a pre-defined minimum.
The sunspaces also include a downstairs bathroom, with a shower, hand basin and toilet, which adds lifetime homes benefit to the houses.
Front porch
The porches help to separate the internal environment from the outside; they effectively act as an airlock to the house. In winter only one door should be open at any one time, this will help reduce heat loss from the house, and thereby help to keep them warm.
The new external brick skin of the walls is now built up, and the cavity created between that and the original solid concrete walls has been fully-filled with insulation.
Wall insulation showing in new cavity at front door
The insulation is between 250-300mm thick; the variance is due to the fact that the original walls had shifted slightly over time, so in some places the cavity was slightly wider than others, and we took every opportunity to get in as much insulation as possible! You can also see in the photo above that the cavity extends down below ground level, to the bottom of the original wall foundations, and insulation was packed down here as well to minimise thermal bridging from the internal floor to outside.
Wall insulation being packed into the cavity at roof level
The photo above shows the insulation being packed into the cavity just below the existing eaves. The insulation is then continued up over the top of the original wall, between the rafters and into the roof space to again minimse thermal bridging at the top of the original walls. This is the weak point of the overall insulated envelope however, as the void over the orignal wall between the rafters only allowed for around 150mm of insulation. The roof was then extended by two rows of tiles to meet the corbelled external skin.
Wall cavity at an opening showing wall tie
The photo above shows the newly created cavity at one of the windows, and if you click on the photo to expand it you can just see the wall tie spanning the cavity four brick courses down. These ties were secured into the original wall by drilling a hole and inserting the tie with a mortar fill and they then span the cavity and are secured in the mortar layer of the external skin. The ties used are Teplo Ties from Ancon, which can be cut to length; traditional ties do not come in sufficient length for this sized cavity.
The new floors have now been laid. The floor slab is 150mm of dense concrete, which sits on top of a new layer of insulation which is 250mm thick. Around the side of the floor slab is 50mm of edge insulation.
Floor insulation being installed, which will be below the new concrete floor
The new floor slab will act as a heat store to help keep the house warm through winter, with heat loss from the slab to outside of the house minimised by the insulation below and around it. The heat then only has one way to go; back into the house as the air temperature drops below that of the floor.
The new concrete floor slab being poured over the insulation layer
In summer the floor slab will act in reverse as a cooling mechanism, because as the air temperature rises above that of the floor, the excess heat will be absorbed into the dense concrete.
The mass of the original solid walls will act as a heat sink in a similar way, helping to cool the house in summer and heat it in winter, once it is fully encased in insulation, which is the next major phase of the retrofit.
We’ve now removed the chimneys from both properties; there are two key reasons for this:
- They are no longer be required as the gas fires have been removed;
- They are a significant source of heat loss.
This also makes it easier to fully insulate the party wall between the properties; this has two benefits:
- It provides sound insulation between the properties;
- It prevents heat being lost from the properties by being transferred through the wall up into the loft space.
It is often wrongly assumed that you don’t need to worry about insulating party walls, since assuming your next door neighbour is heating their house, then there will be no heat loss. However, research has shown that heat will be transferred via the party wall up into the loft space and to the outside. Insulating the party wall on both sides will prevent this from happening.
So that just leaves the question how will santa gain access on Christmas Eve? Well, we’re guessing he’ll use the roof lights in the newly added sun space; its flat roof will be easier for him to park his sleigh on too …
[youtube=http://www.youtube.com/watch?v=pzAkUxNvKfM]
In the video below, project manager Nick Martin talks us through the main fabric improvements that are going to be made to the properties.
Our aim is to incorporate HHP design principles in a retrofit, i.e. combining high thermal mass, passive solar gains and high levels of insulation to remove the need for a space heating system, and therefore significantly reduce running costs and emissions from the homes.
[youtube=http://www.youtube.com/watch?v=gI7tFBMrHfI]
We will post further videos over the coming weeks looking at various aspects in more detail as we progress the retrofit work. We hope you enjoy this summary, and please let us know what you think.